AllChem Logo

русский















Maintenance service of the bench equipment

Attention: oil in the pump should be replaced quarterly.

  • To start the power switch.
  • To turn the manual gates located on both ends of the hose.
  • To press button RECLAIM ONLY.
  • At ignition of green lamp LED it is necessary to disconnect MRC device from the power supply (switching-off of the electric power).
  • To unscrew two screws located below on the front side of the control panel and to raise the control panel.

Attention: At the following stage there may be the refrigerant under pressure. Therefore it is necessary to dress goggles and gloves

  • After having marked the entrance, target and returnable hoses for simplification of posting at return installation, to remove these hoses.
  • After having turned out under the shelf fixing nuts, to remove the oil cylinder.
  • After having inclined the tank, to fill oil according to the rules in capacity.
  • Using a small funnel, to fill the pump oil into the exhaust outlet PORT of an oil tank.
  • To set up again oil tank on a shelf located in a cell, to fix with earlier turned off nuts.
  • To connect again 3 hoses to each aperture.
  • To close the control panel and to tighten screws.

Way of storage of MRC-450 device on long term

1 – oil tank
2 – pump
3 – screws

At storage of MRC on long term and for maintenance of the appropriate characteristics it is necessary:

  • Performance of consecutive maintenance service of suction separator.
  • Using the sequence of maintenance service of the pump, to replace the pump oil.
  • To close all manual gates which are placed on the recycling tank, filling tank, hoses.